l9n/ New Jersey

2006–2007 Session

Senate Bill 2936

Revises law concerning electric power net metering, safety and power quality interconnection standards; requires BPU to adopt certain renewable energy credit rules. *

Became P.L.2007, c.300, on January 13, 2008.

Sponsors

Who carried the bill in each chamber, and who signed on. Each name leads to the member's page.

In the Senate

In the General Assembly

Its course

November 8, 2007 to January 13, 2008, on one scale. In the top row each mark is a day something happened; taller marks are busier days.

Each committee stop sits inside its chamber.

Every action7 actions on 5 days

In the SenateNov 8 to Jan 356 days

Economic GrowthNov 8 to Dec 1739 days

In the General AssemblyJan 3 to Jan 74 days

With the GovernorJan 7 to Jan 136 days

Votes

Yeas to nays, as the Legislature recorded them. Committee votes are set in.

  • Senate, third reading34–0

    Passed · Jan 3, 2008

  • General Assembly, third reading47–29

    Passed · Jan 7, 2008

Text

Each version as the Legislature printed it.

l9n doesn't hold this bill's text yet.

What happened

In l9n's words, one line for each step. Every action as the Legislature published it is below.

In the Senate Nov 8 – Jan 3, 2008

  1. Introduced in the Senate and sent to Economic Growth
  2. Economic Growth recommended it as amended
  3. Read a second time
  4. Passed the Senate, 34 to 0

In the General Assembly Jan 3, 2008 – Jan 7, 2008

  1. Arrived in the General Assembly
  2. Read a second time
  3. Passed the General Assembly, 47 to 29, and so both houses

To the Governor Jan 13, 2008

  1. Signed by the Governor
  2. Became P.L.2007, c.300
All 7 actions, as published